Wednesday, December 31, 2008

2008 Stock Scion Tc Tail Lights

Warehouse Simulation on plouz

Listing:
Price: € 127 000 Postal Code: 29260
PLOUZANE local offices and warehouse of 450 sqm on axis through the gates of Brest cinderblock building steel frame, fully serviced, health, offices equipped with 1600 square meters of building land , may also be suitable for loft
price € 127 000 ISPs immoliaison June 1960 19 5016 63 86 MT


the announcement here: http://www.bretagne-pme.com/fr/immobilier/105638_PLOUZANI__local__entreput_et_bureaux_de_450m2_sur_axe_passant_aux_portes_de_Brest__construction_parp___.htm

254 rue de Brest Plouzané to
http://applications-internet.brest-metropole-oceane.fr / VIPDU40/aspx/HTDU401.aspx

I contacted the seller directly, but he wants to go through the realtor.
So I took appointment with the agent at 14:00 Friday. The built

: 450 M ² WITH
the front office, garage car.
1 office
2 laboratories, one of which is rented 400 euros for 3 years
1600 m² building


Construction: 30 * 14 m
12 homes available with mezzanine

Simulation financial
47 KE Recipe rent
Buy: 330 KE (127 + 200)
yield gross profits 1st
7 years after 11 years
work: mainly implemented through

Here a spreadsheet to estimate finely + renovation costs
http://spreadsheets.google.com/ccc?key=pakb-BxJ2riR6_IcG1g3QVA&hl=en

Financial simulation: http: / / spreadsheets.google.com / ccc? key = pakb-BxJ2riRBhW3LoWExMQ

Wednesday, December 24, 2008

How Long Does Robaxin Stay In Your System?

budget / renovation

The surface area of the house is 170 m2 (only)
Cost: between 65 kE (mini in mini) and 110 KE (average)
knowing that the work was estimated by an arch between 180 and 230 KE KE

Either a loan between 20 and 25 years (depending on the cost of work) if is providing 3.5 kE

to get the loan and the project is viable, it must quickly (very quickly) how + tall.
is possible but if it meets certain conditions:
1) obtaining planning certificate
2) good agreement of the shareholders
3) Availability of shareholders
4) loan from the bank
...

Give me your opinion!

Tuesday, December 23, 2008

Whatfood Makes Your Voice Sweet

RDV Bank + service planning

Friday, 2 to 10:00 with Ms. Primel mayor of Plouzané
Saturday 3 to 10:00 with Ms. Le Bihan CMB Plab

For those who preferred means of being join me ...

Monday, December 22, 2008

How Are Mountain King Trees Put Together

reduced rate of VAT for renovation work done by a service

Question. part of a SCI submitted to the IR family owns a building used for rental, what rate of VAT are subject renovations 5.5 or 19.6.

Response. Any natural or legal person (company , whether owner, tenant, occupant without payment being run by a building professional, work in a residential housing completed over two years, may benefit from reduced VAT rate to 5.5%, as housing is a primary or secondary residence.

To qualify for the reduced rate, the customer must provide the claimant, a document attesting that the date of completion of construction of housing is older than two years of commencement of work covered by the 5.5% VAT .

The catch: You can directly purchase raw materials with a VAT rate of 5.5: We have to necessarily go through a company. More info here: http://droit-finances.commentcamarche.net/faq/sujet-930-taux-de-tva-reduit-a-5-5-et-travaux-sur-locaux-d-habitation


Crazy Things Sororities Make You Do

habitat BMO SCI & ANAH

VC call with ANAH (brief) and BMO (Madeleine Cloâtre)

Eligibility for grants with ANAH:
house more than 15 years after work
rent 9 years
rent capped
Work done by professionals
The project must fall within the priorities of intervention ANAH (eg rehabilitation of Saint Martin). At first the little student housing does not fit their criteria
The project must meet the needs of the town hall

If conditions are met, the aid is very important :
On a base (ceiling) of 650 euros per m2, 40%
supported by ANAH
5% by the regional council capped at 2,000 euros
5% by the General Council capped at 3,000 euros + bonus
BMO

=> There is no help for auto restoration except for reintegration projects

Radeon 9200 Family Agpdrivers



Should we break the concrete slab floor? Or, if there is rising damp
In this case => lime-hemp tile 10 cm by 15 cm hedgehog
Step 1: (1d 1 / 2) cracking of the slab (10 à15cm) in Using 2 of loc breaker, with the help of 2 friends (1 + 2 in the wheelbarrow with a hammer),
Step 2: (1d to 2 pers.) Breaking and removal of large blocks with a mini excavator (90 cm wide): This decision was long the Because of the expense but it was worth it, I will have broken the lower layer to the deck alone,
Step 3: (2d only) removal of remaining concrete blocks ... shovel, pick, Baramine (very useful sometimes), and wheel barrow (knows no electric model ...:)),
Step 4: (5 x 1 / 2 day only) unpacking (15 to 20 cm) beat up the earth (clay-sand mixture relatively dry), the uh ... again (by economy and because I had the time) with a shovel, pick and wheelbarrow (the same)


You may have to remove the cement on the interior bearing walls to facilitate breathing walls and limit moisture


a idea of partition hemp http://www.maison-tregor.eu/chambre/cloisons.htm

Sunday, December 21, 2008

What Color Couch Should I Get?

various wood floor insulation (joists)

Here it goes: http://www.maisons-et-bois.com/ discussions / viewtopic.php? id = 12721 .
PS: Follow closely the advice of "Grendizer" (he is very competent)

Extremely Sore Shoulders

concrete slab or wood joist insulation

still on the site of Were-breizh ( http://www.tiez-breiz.org/forum/index.php? topic = 27.0 ):
A rigid slab is strongly discouraged in the old buildings, for various reasons, a most unexpected order seismic ... Indeed, the laying of a tile set with the interior facing wall that in case of earthquake, the floor can become dislodged and crashed to the lower level ... good is a nightmare scenario of course, but unfortunately this has been observed and analyzed ...
So in old buildings, no heavy slab of cement concrete, a rigid structure in a relatively soft little place ... it is easily understood.
Me I would go on a slab hemp and lime with hemp on wooden partitions. It's not more complicated, it's different! and finish is far more healthy and pleasant! ...
I described this type of site on a personal website www.maison-tregor.eu . "
There are ways to seal parts of water on a wooden floor:
http://www. maisons-et-bois.com/discussions/viewtopic.php? id = 14943

=> Go Go wood floor
=> To not spoil, Ca significantly reduced the budget and ...

Pant With Built In Jock Strap

stone wall 50 cm

I recommend Reading these two articles published by a local association Were-Briez:
http://www.tiez-breiz.org/enduits.htm
http://www.tiez-breiz.org/isolation.htm

Conclusion:
No interior insulation, brakes just vapor
A medium term, the insulation ext Couleur du texte UPPER see photos from the book of reference JP Olivia
must first remove the cement plaster on the facade.
=> To not spoil, Ca significantly reduced the budget and remains on healthy materials

Good news: There is no regulation on heat of old buildings (not concrete). We will therefore not be forced to isolate from the inside. Energence told me that he is more and more of easy to obtain agreements to insulate from the outside even when facing the street




Saturday, December 20, 2008

Where Cytherea Is Now

House nuns to Plouz

Selling:
parcel No. 234 of 82 sqm. Is it coupled with the main plot?
This parcel could allow specific access to the farmhouse
Parcel No. 136 of 757 m2 plots
sopnt area in AU, ie high density (everything is constructible if it respects the rules of access road, Parking ...). The farmhouse could be Living easily if we make a declaration at the town hall
three possible levels, max of 9 meters
is a house of 1906 with 130 m2 area (GFA is different: it is 130 m2 without walls and partitions).
parasitic state, especially asbestos and Assinie to be made by the seller
The mains drainage would miss
Hall Plouzané
is public parking in front
The community is apparently not into it by private homes. It will not use a priori pre-emption
The church is not closed. (Possible battery velux roof)
Condominium:
This can be interresting for us to mount a condominium to ease the resale lot is with the notary need to establish this arrangement
Housing subsidized. This service
habitat BMO Conventionshall dwellings. the rub: when the housing is subsidized, the student can get aid, but the rent is capped. It should quickly see this point because it determines the profitability of the project.
Aid Renewal:
aid for the renovation of homes under contract may be interresting. To see the service with Habitat BMO
Conduct respect Parking
0.6 parking spaces per unit + 1 per 100 m2 gross
12.5 m2 per place.
For 10 units => 110 m2 parking