arrangement
- 6 of 24 sqm Studio: Range Low / market study: it is small and compact + and + the performance will be better
m² Height: 3 m Height
1st floor: 2.5 m
- Roof 2-sided to a mezzanine floor: low crawling
Height: 50 cm Height
creeping up: 2.1
mezzanine area: 6 m² minimum 9 m² max
- 1 room: Kitchen + Living
- 1 room of 3 m: WC + Washbasin + Toilet Turk of Recycling!
- 1 cupboard (l * L * h): 2 * 0.5 * 2.5
- Charge ideally south with open (entry + berries) south
- Sterile around the house (no lawn)
- Bamboo for hedges
- 1 parking space per studio + 0.6 for the land
Saturday, November 22, 2008
Fashiontvwithoutclothes
The main principles of construction of statutes
- + foundation or crawl space if possible, a hedgehog (cheaper slab with lime hemp)
- wood frame house in Douglas (protection natural / termites & fungi)
- steel roof tray if possible, otherwise slate
- Insulation: define
- Octopus Electrical Plumbing PEX
- Partitions internal plasterboard or metal rail fermacell
- bearing wall to define: pallet + earth + reeds
- Electric Heating
- wood or aluminum windows (PVC or condition whatsoever windows occaision)
Friday, November 21, 2008
East Indian Escorts Nevada
SCI
Well I'm starting.
Here's a first draft bylaws:
http://docs.google.com/Doc?id=d22dkcp_13hqmb4fdm
the last page, the questions I ask myself. Inspired
these articles: http://docs.google.com/Doc?id=d22dkcp_11gw3kcgcc A
your comments.
Well I'm starting.
Here's a first draft bylaws:
http://docs.google.com/Doc?id=d22dkcp_13hqmb4fdm
the last page, the questions I ask myself. Inspired
these articles: http://docs.google.com/Doc?id=d22dkcp_11gw3kcgcc A
your comments.
Friday, October 17, 2008
Office 2007 By Telephone
first AG
Agenda:
- discuss the return of the 1st study cycle at Plouzané
- Present the project area to build, investment, revenue, length of loan.
- Define in broad terms the management of SCI in the short term (the self), medium term (< 10 ans / décennale) et à plus long terme.
- Return information about an appointment with the banker and the lawyer
- Round table: on the felt project, requiring clarification,
- Go / No Go,
A plan in October
Agenda:
- discuss the return of the 1st study cycle at Plouzané
- Present the project area to build, investment, revenue, length of loan.
- Define in broad terms the management of SCI in the short term (the self), medium term (< 10 ans / décennale) et à plus long terme.
- Return information about an appointment with the banker and the lawyer
- Round table: on the felt project, requiring clarification,
- Go / No Go,
A plan in October
Subscribe to:
Posts (Atom)